Thursday, January 5, 2017

Plastering Complete in the Upstairs Room

The plastering is complete and we are very pleased. A lot of drying/curing now needs to take place. The thermostat is set at 60° F and the dehumidifier (visible in some shots) is set at 60%.

Our plasterers have been showing up at 7am and it snowed last night. I was out in the dark blowing the driveway. It really disturbed our fox. He/she was skirting around the edges of the yard the entire time. Of course, the wildlife camera caught nothing. Wildlife camera has been moved.

Looking up the stairs from the kitchen.

Upstairs from the landing.

Looking downstairs.

The door to one of the upstairs bedroom.

Looking from that door toward the far end of the room.


Inside the gable.



-JC-

No comments:

Post a Comment