Friday, March 10, 2017

Floor Progress

The floor is finished all the way to the North wall. Getting it in under the baseboard radiator was brutal. Next step is to move everything over onto the finished side and start working towards the South (closet) wall)

Amazingly, everything worked out in even boards all the way to the wall. The one exception was at the far corner where you can see shims holding in a tiny piece that will fill a small gap that would show beneath the baseboards.

The pieces under the baseboard radiator had to be secured with construction adhesive. One end of one board didn't want to lay flat so that pry bar (just visible at the end of the radiator) is holding it down until the adhesive dries.
-JC-